Fabrication and assembly of non-standard equipment for Plant of semi-conductors Ltd., Zaporozh`e tanks for oil,
Project: Fabrication and assembly of non-standard equipment
The works were made at two stages:
The first stage - Execution period: April-May 2010
1. Fabrication and assembly of an apparatus with mixer, the apparatus is equipped with semi-pipe jacket and thermal insulation.
2. Fabrication and assembly of a tank, volume of which is 100 m3, the tank is equipped with outside heating coil and thermal insulation.
3. Fabrication and assembly of a silo, volume of which is 88 m3,
The second stage - Execution period: September – October 2010.
1. Fabrication and assembly of a silo, volume of which is 90 m3.
|
||
|
|
|