Projects tanks for oil,

Project: Construction of the plant for bioethanol production (Zolotonosha, Cherkassy region)

  Execution period: 2006 - 2009Description of the project: NPF Alkon Ltd. is constructing and assembling a...
Next

Fabrication and assembly of non-standard equipment for Plant of semi-conductors Ltd., Zaporozh`e

Project: Fabrication and assembly of non-standard equipment The works were made at two stages: The first stage - Execution period: April-May 2010 1. Fabrication...
Next

Fabrication of a tank for organic matter agitation, volume 6 m3, maid of stainless steel.

Fabrication of a tank for organic matter agitation, volume 6 m3, maid of stainless steel. Customer: Interstar Ukraine Ltd. Execution period: the second half of June 2010  ...
Next

Fabrication of the 3 tanks

1. Fabrication of a tank for alkali, volume 20,2 m3, maid of stainless steel. 2. Fabrication of a feed tank, volume 24,6 m3, maid of...
Next

Fabrication of metal construction of bins 10 pieces (volume 10 m3 of each, material carbon steel)

Project: Fabrication of metal construction of bins – 10 pieces (volume – 10 m3 of each, material – carbon steel) Customer: Starinskaia poultry factory agricultural...
Next

Renewal of the tank`s roof without a pontoon (volume 1000 m3, material carbon steel)

Project: Renewal of the tank`s roof without a pontoon (volume – 1000 m3, material – carbon steel) Execution period: November 2009 Customer: Kalina-LTD Closed company...
Next

Description of the project: fabrication of a tank for water, volume 200 m3, maid of carbon steel.

Description of the project: fabrication of a tank for water, volume 200 m3, maid of carbon steel. Execution period: October 2009  ...
Next

Tank repair

 Description of the project: renewal of the bottom and 150mm of the first ring of the shell of a tank, volume 1000 m3, maid of...
Next

Description of the project: fabrication and assembly of a tank, volume 17,8 m3, maid of stainless steel.

Description of the project: fabrication and assembly of a tank, volume 17,8 m3, maid of stainless steel. Execution period: August 2009...
Next

Construction and assembling works of 3 tanks for alcohol storage at Marilovskiy alcohol plant State enterprise (Ternopol region)

  Execution period: May 2009 Description of the project: 3 tanks for alcohol storage (volume 500m3 each)...
Next

Assembly of tanks at Starch&Molasses Plant (Dnepropetrovsk) by request of Firm Khimmashservis Ltd. was realized by stages.

1.Execution period: August - December 2006 Description of the project: Assembly of 20 tanks made of stainless steel, volume 300 m3 each 2.Execution period: May...
Next

Assembly of tanks at Starch&Molasses Plant (Verkhnedneprovsk)

  Execution period: April - October 2008 Description of the project: Assembly of 6 tanks made of...
Next

Construction and assembling works of tanks for VostGOK State Enterprise (Zheltye Vody)

Execution period: December 2007 – March 200...
Next

Construction of two tanks (volume 400 m3 each) by method of unrolling

Execution period: December 2008 - February 2009 Description of the project: Two tanks (volume ...
Next

Repair of a tank, supply and assembly of an aluminum pontoon for Kremenchugnefteprodukt Public Corporation (Kremenchug)

 Execution period: March-April 2008 Description of the project: Repair work of a tank (volume 1000 m3), namely,...
Next

Repair of a tank (volume 400m3) for AOZT Company Aydar Liga (Lugansk)

 Execution period: October 2007 Description of the project: Renewal of the bottom of a tank (volume 400 m3)...
Next

Supply of Pivot Master drain systems for Refining complex Galychyna Public Corporation (Drogobych)

 Project: Supply of Pivot Master drain systems in quantity of 4 units for Refining complex – Galychyna Public Corporation (Drogobych) Execution period: September 2007 Description...
Next